Saturday, November 20, 2010
Timeline for outdoor classroom
ASAP Top Soil to cover entire outdoor area
Dec. 1-7 Rough grade so it slopes away from building
Dec. 8-14 Dig trenches for drainage and sprinkler system
Dec. 15-22 Install drainage and sprinkler systems (Need drainage system)
Jan. 3-14 Install walkways (pea gravel, flat stones, etc.?)
January Install ponds and water features (maybe just one large pond with waterfall)
January Construct gazebo, trellis, and pergola
February Install gardens
February Install low voltage lighting
End of March Ribbon cutting ceremony